Goals
Hain Daniels sought a partner to help them deliver their site energy reduction program, aiming to deliver large savings now and in the future. The project involved integrating new technology into an existing plant, with limited space, and ensuring that the factory was able to continue running at full capacity.
To enable Hain Daniels to improve efficiency we committed to deliver:
- A replacement AD system designed to treat the current effluent load and a 20% uplift for future expansion, plus an additional capacity to treat waste jam currently sent off-site for animal feed.
- Improvements to the capacity and performance of the anaerobic reactor on a compact footprint
- Improved capture of valuable energy that was previously underutilised