Project Scope
The project aimed to strengthen the long-term resilience of a critical asset within the site's anaerobic digestion process, including:
- Temporary biogas storage installation and operational continuity planning.
- A full clean and inspection of the post-digester tank to assess asset condition and support future maintenance planning.
- Refurbishment of the integrated gas storage system and associated infrastructure.
- Installation of new level monitoring technology.
- Testing, commissioning and return to service of the refurbished asset.
- Delivery of all works while maintaining uninterrupted wastewater treatment and energy recovery operations.