Project overview
A private wastewater treatment plant was required to allow the development of 1500 new homes in the South of England. The requirement was to install the plant in two stages alongside the two phases of the housing development of 750 plots per phase.
Alpheus Provided:
- Support in acquiring planning permission and liaison with the Environment Agency (EA) and other stakeholders.
- Design, construction and commissioning services including all civil, mechanical, electrical, and process works.
Alpheus was the Principal Contractor under CDM Regs and addressed the issues of working within a site with a tight footprint constrained on one boundary by a cliff and another by a lake.